Skip to main content

Polish project plan

The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project.
February 28, 2012 Read time: 2 mins
The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project. Speed is of the essence in this project given that a section of A2 highway between Lodz and capital Warsaw has to complete by 2012 in time for a major international football event. The key section in question is for a 20km stretch between the two cities. Up to 26 companies are said to be in the frame for the contract at present, including 3281 Eurovia, Polimex and 945 Strabag, as well as several other leading firms. Chinese contractor 2487 COVEC originally won the deal to build this section of highway but was forced to relinquish the deal following a series of delays and financial issues. The award of the contract to COVEC was controversial as the Chinese firm made a bid that was considerably lower than any of the other firms in the tendering process. Other contractors complained that they were not able to compete due to the exceptionally low bid by the Chinese firm. COVEC then tried to renegotiate its deal when it was hit with increasing costs of materials and other factors but this was declined by the Polish authorities. With time ticking away and the link still to be completed, the Polish authorities now face a major problem in finding a firm that can take over the project and finish the necessary work in time.

For more information on companies in this article

Related Content

  • Zimbabwe road upgrade being planned
    February 4, 2019
    Construction work for the Beitbridge to Victoria Falls road upgrade project is expected to start shortly.
  • New road now open to traffic in Rwanda
    September 24, 2015
    A major road project in Rwanda has been completed on schedule by contractor STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Deve
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Digital cameras and VMS improve London and Scottish road safety
    March 18, 2016
    London and Scotland are using VMS and digital cameras to successfully lower road deaths. Road safety measures such as variable message signs (VMS) and digital cameras have boosted road safety in the UK capital London and also in the Scottish Highlands. And the systems need not be a drain on electricity supplies. Full matrix driver information signs from SWARCO Traffic, one of the UK’s leading traffic management technology providers, are being installed for the first time across the Transport for London (TfL