Skip to main content

Polish project plan

The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project.
February 28, 2012 Read time: 2 mins
The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project. Speed is of the essence in this project given that a section of A2 highway between Lodz and capital Warsaw has to complete by 2012 in time for a major international football event. The key section in question is for a 20km stretch between the two cities. Up to 26 companies are said to be in the frame for the contract at present, including 3281 Eurovia, Polimex and 945 Strabag, as well as several other leading firms. Chinese contractor 2487 COVEC originally won the deal to build this section of highway but was forced to relinquish the deal following a series of delays and financial issues. The award of the contract to COVEC was controversial as the Chinese firm made a bid that was considerably lower than any of the other firms in the tendering process. Other contractors complained that they were not able to compete due to the exceptionally low bid by the Chinese firm. COVEC then tried to renegotiate its deal when it was hit with increasing costs of materials and other factors but this was declined by the Polish authorities. With time ticking away and the link still to be completed, the Polish authorities now face a major problem in finding a firm that can take over the project and finish the necessary work in time.

For more information on companies in this article

Related Content

  • European regulations for engine emissions are getting tougher
    January 4, 2013
    Emissions remain the focus for engine development but equipment manufacturers want clarity from regulators. Emissions remain a major challenge for the off-highway construction equipment market. The EU has tough targets in this respect and its objective is an overall reduction of CO2 emissions of 80-95% by the year 2050, compared to 1990 levels. There is considerable research already underway on how to reduce fuel consumption and to help ensure the security of energy supply. A number of industry sectors, suc
  • Africa’s road builders need a reliable supply of good-quality bitumen
    May 8, 2015
    Crying out for consistency Getting hold of the right product, or any product at all, is often the challenge, as delegates to the Argus Africa Bitumen conference heard Many parts of Africa have ambitious road building plans for the next few decades. But clients and contractors are facing problems with the quality and supply of bitumen, delegates at the Argus Africa Bitumen conference were told. If there was one overriding message to come out of the conference, held in Dar Es Salaam, Tanzania in Feb
  • Polish tunnel opening to traffic
    July 5, 2023
    The Polish Swina tunnel is opening to traffic.
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th