Skip to main content

Polish plan redeploys funds

A healthy €865.5 million is being spent on infrastructure projects in Polish capital Warsaw in 2011.
March 5, 2012 Read time: 1 min
A healthy €865.5 million is being spent on infrastructure projects in Polish capital Warsaw in 2011. Of this, a substantial portion will be invested in works to the Trasa Polnocna road. Meanwhile the Polish Ministry of Infrastructure has announced that the €102 million saved in the tender for the construction of a ring road in Augustow in Podlaskie will be reinvested in other road construction projects in the region. Work is continuing on two sections of the S8 link between Bialystok and Warsaw.

Related Content

  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    February 7, 2012
    POLAND has ambitious plans to construct around 900km of new highways in time for the European Football Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Russian roads and bridges being planned
    April 22, 2020
    Russian road and bridge construction and maintenance works are being planned.
  • Two Polish road projects moving aheaaad
    March 9, 2017
    Work on two sections of the S17 highway in Poland will now go ahead following the granting of permission from the local authorities in the Mazowieckie area. In total the two stretches of the S17 will measure over 25km long. One of the stretches will connect Gonczyce with the ring road around Garwolin and will measure 12.2km. The other stretch runs from Lubelskie through Mazowieckie to Gonczyce and is 13km long. The work is being carried out by the contractor Budimex. Work on a further 95km stretch of the S1