Skip to main content

Polish deal done

The Hermann Kirchner consortium will build a 20km section of Poland's S8 express road linking Walichnowy and Zloczew.
February 29, 2012 Read time: 1 min
The Hermann Kirchner consortium will build a 20km section of Poland's S8 express road linking Walichnowy and Zloczew. The deal is worth some €164.8 million. The project is expected to take 27 months to complete and the award was made by the Polish road authority, 1361 GDDKiA. Bidding was strong for the project with Hermann Kirchner beating strong offers from other firms including the Chinese 3414 Shanghai Urban Construction Group.

For more information on companies in this article

Related Content

  • Polish road building programme in hand
    November 13, 2015
    Poland’s road authority GDDKiA has signed 13 road deals and has secured European financing worth a combined total of €1.91 billion. These works are being carried out from 2014-20. The available EU finance in the current perspective allocated to GDDKiA's projects stands at close to €10 billion. Poland’s road investment programme for 2014-23 includes building at least 3,900km of roads and 57km of ring roads.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • US$2.66 billion tender for Poland’s A1 motorway will be called in mid-2013
    January 25, 2013
    Poland's General Directorate for National Roads and Motorways (GDDKiA) is to announce a US$2.66 billion [€2bn] tender in mid-2013 for the construction of the A1 motorway between Pyrzowice near Katowice and Tuszyn near Lodz. According to the head of GDDKiA, the tender for the 140km-long road will be divided into sections of around 20km. The Polish government has given up on its original idea of constructing the road on a PPP model, since Eurostat insisted that the cost of the project should be added to Polan
  • Poland is planning a series of highway projects
    March 15, 2013
    Poland’s Ministry of Transport plans to invest heavily in road projects from 2014-2020. The Polish road authority, GDDKiA, will invest €16.91 billion in new roads. A key project will be for the section of the Berlin-Lisbon A2 highway that runs through Poland. This will run through Zakret near Warsaw and connect to the Minsk Mazowiecki ring road and is expected to cost close to €1.7 billion. Meanwhile the A1 highway linking Pyrzowice and Tuszyn will cost in excess of €1.8 billion. GDDKiA is also planning to