Skip to main content

Policy proposed for US on emissions

Stricter standards for particulate matter (PM) or soot proposed by the US Environmental Protection Agency (EPA) could endanger transportation improvements. That is the message from the American Road & Transportation Builders Association (ARTBA), which believes that the tougher PM standards could put federal highway funds in jeopardy. Marc Herbst, executive director of the Long Island Contractors’ Association (LICA) and chairman of ARTBA’s Council of State Executives, explained that EPA’s proposed new standa
July 5, 2012 Read time: 2 mins
Stricter standards for particulate matter (PM) or soot proposed by the US 1293 Environmental Protection Agency (EPA) could endanger transportation improvements. That is the message from the American Road & Transportation Builders Association (ARTBA), which believes that the tougher PM standards could put federal highway funds in jeopardy. Marc Herbst, executive director of the 6112 Long Island Contractors’ Association (LICA) and chairman of ARTBA’s Council of State Executives, explained that EPA’s proposed new standards come at a time when counties are still struggling to comply with existing regulations.

He said that the proposed regulation, “…creates a counterproductive cycle where new standards delay needed improvements to the nation’s highway and bridge network, which has already reached ‘critical mass’ in terms of being able to serve the needs of our citizens and economy.”

Herbst went on to describe the impact of EPA’s proposal noting, “States and counties need predictability and time to develop transportation plans which achieve PM reduction and create jobs. Adding a new layer of requirements on top of existing standards that have not been fully implemented only complicates these ongoing efforts. Specifically, existing projects deemed to be in compliance with the Clean Air Act when first undertaken could be thrown out of compliance if new standards are approved, exposing project owners to costly, time-consuming litigation.”

Herbst also explained how EPA’s actions are counterproductive to current efforts to reauthorise the federal surface transportation program, saying, “It is ironic that members of both chambers and parties have made streamlining the environmental review and approval process for transportation projects a priority of the transportation bill, yet few talk about how EPA’s PM proposal will severely disrupt the very process they are trying to make more effective.”

For more information on companies in this article

Related Content

  • Workzones benefit from new mobile speed enforcement technology
    April 10, 2012
    A variety of new technology for temporary speed zones during major highway projects across the globe is about to hit the market, while other proven systems remain in demand. Guy Woodford reports. The D-Cam P is one of four new mobile speed reading products for temporary speed zones being launched this month by Truvelo. Deployable solely as a speed camera or at a red light intersection to monitor red light offences, the D-Cam P can also act as a speed camera on the green and amber light phases. The machine d
  • US$2 billion George Washington Bridge repair
    December 10, 2024
    A US$2 billion repair project is underway for the George Washington Bridge in the US.
  • Reducing congestion while maximising safety in road construction work zones
    April 30, 2015
    Mike Dreznes, executive vice president at the International Road Federation (IRF) discusses road safety for work zone areas. Work zones around the world can create significant congestion and can cost society billions of dollars. Estimates in the United States alone include approximately 87,600 work zone crashes involving 37,500 injuries that result in 482 million lost hours, valued at approximately US$6.5 billion. When considering these numbers worldwide, it becomes clear that work zone safety and work zone
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time