Skip to main content

Poland’s viaTOLL system expanded

The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.
January 21, 2013 Read time: 1 min
The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.

Related Content

  • Divine intervention?
    February 24, 2012
    An American man rammed his vehicle into a car being driven by a woman and later claimed he had done so under express instructions from God. The man crashed his pick-up truck into the woman's car while he was travelling at over 160km/h. His vehicle hit the rear of the car and both vehicles spun across a median then came to a stop along a barrier in the opposite lanes. Luckily the drivers suffered only minor injuries and police commented that this could have been a sign of divine intervention given the high s
  • Portsmouth bridge gets cash boost
    December 17, 2012
    Major improvements are planned to tackle a traffic bottleneck on the Northern Road Bridge in Portsmouth, on the English south coast, after the government pledged €13.73 million [£11 million] for the project. The Department for Transport has given final approval to the scheme which will see work on a replacement bridge over the Portsmouth to London railway line at Cosham. The original bridge was built to carry a dual carriageway road but is now too weak to do so. Traffic has been restricted to a single lane
  • Polish road in tender trouble
    December 17, 2012
    A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDD
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.