Skip to main content

Poland’s viaTOLL system expanded

The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.
January 21, 2013 Read time: 1 min
The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.

Related Content

  • Focusing on workzone safety systems
    March 16, 2012
    The US has seen a major reduction in deaths following accidents in its highway construction work zones, while Europe and other parts of the world are looking at new safety technology and systems to trigger a similar trend. Guy Woodford reports. Work in the US to reduce the likelihood of potentially fatal accidents at highway work zones is paying dividend.
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b