Skip to main content

Poland’s viaTOLL system expanded

The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.
January 21, 2013 Read time: 1 min
The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.

Related Content

  • Upgrade and new road projects in Poland to cost €4.33 billion in 2013
    March 19, 2013
    Polish spending on modernisation and new road projects will reach around €4.33 billion (PLN 18bn) in 2013. Among the planned investments are a section of the five express roads between Rawicz and Leszno, a section of the A1 motorway between Swierklam and Mszana, and a section of the A4 motorway between Korczowa and Jaroslaw. Private companies have been contracted to maintain around 1,000km of motorways and roads, which will result in savings achieved by the General Directorate of National Roads and Motorway
  • Poland targets 300km or new roads for Western Pomerania by 2023
    August 1, 2017
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the National Roads Construction Programme. Among the project in the region that borders the country’s Baltic Sea coast is an S3 dual carriageway between the towns of Swinoujscie and Szczecin. Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the
  • REBLOC barriers for Rheinbrücke Leverkusen
    July 26, 2024
    Construction of the vehicle restraint system for the new Rheinbrücke A1 Leverkusen (bridge) in Germany was a challenge, according to REBLOC, maker of the system.
  • Deals signed to construct Polish highway project
    August 22, 2017
    Construction of a stretch of the S7 dual carriageway in Poland will commence shortly following the signing of contracts for the work. The stretch, connecting Lotnisko junction with Grojec's ring road, will cost €186.66 million to build. Three contracts were awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA) for the work. Rubau Polska will build a 7km section while a 14.8km stretch will be built by IDS-Bud and Mota-Engil Central Europe will build an 8km portion of the link.