Skip to main content

Poland’s regional government issues permit for US$207.52mn ringroad project

Polish regional government of the Podlaskie Voivodeship has granted a permit for the construction of a ringroad in Augustow. Weather permitting, the US$207.52 million (PLN 659mn) project in the north-east Poland town may commence before the end of 2012 and is to be completed by September 2014. The new road will be 36.3km long and avoid the Nature 2000 protected area.
December 12, 2012 Read time: 1 min
Polish regional government of the Podlaskie Voivodeship has granted a permit for the construction of a ringroad in Augustow.

Weather permitting, the US$207.52 million (PLN 659mn) project in the north-east Poland town may commence before the end of 2012 and is to be completed by September 2014. The new road will be 36.3km long and avoid the Nature 2000 protected area.

Related Content

  • Australian highway project is due to commence
    December 14, 2022
    A major Australian highway project is due to commence.
  • Croatia’s Konstruktor and India’s Simplex win US$335mn Oman motorway contract
    May 22, 2013
    Croatian construction firm Konstruktor and India’s Simplex Infrastructure are reported to have been awarded a contract worth US$ 335 million (€259.34mn) for the construction of 46km of motorway in Oman. The joint venture project envisages that Konstruktor will hold 48%, while Simplex will own 52% of the project. The deal has been signed with the Ministry of Transport and Telecoms of Sultanata Oman.
  • Bolivia's Santa Cruz road corridor connector project
    December 22, 2016
    Bolivia’s ambitious Santa Cruz road corridor connector project is providing an important link for the country - Gordon Feller writes The World Bank has been organising a US$230 million loan to upgrade a vital connector linking the country’s northern and southern transit corridors. Meanwhile, another $100 million is coming from Bolivia’s government.
  • Strabag to build 24km section of Poland’s S6 for €83 million
    November 2, 2015
    Publically listed Strabag has won the design and build contract to build a 24km section of Poland’s S6 for €83 million. The S6 expressway links the largest cities in northern Poland, Szczecin and Gdańsk. The publicly listed construction group Strabag will design and build the section between Goleniów and Koszalin for about €83 million. Construction of the 24 km dual carriageway asphalt road with two lanes of traffic in each direction will start this month with a scheduled finish of June 2019. The cont