Skip to main content

Poland’s regional government issues permit for US$207.52mn ringroad project

Polish regional government of the Podlaskie Voivodeship has granted a permit for the construction of a ringroad in Augustow. Weather permitting, the US$207.52 million (PLN 659mn) project in the north-east Poland town may commence before the end of 2012 and is to be completed by September 2014. The new road will be 36.3km long and avoid the Nature 2000 protected area.
December 12, 2012 Read time: 1 min
Polish regional government of the Podlaskie Voivodeship has granted a permit for the construction of a ringroad in Augustow.

Weather permitting, the US$207.52 million (PLN 659mn) project in the north-east Poland town may commence before the end of 2012 and is to be completed by September 2014. The new road will be 36.3km long and avoid the Nature 2000 protected area.

Related Content

  • Poland's highway projects benefit from EU funds
    May 15, 2012
    Since 1990 loans worth a total of €10 billion have been granted by the EIB for Polish road projects, with some 20% of the loans going to private companies. During 2010, the EIB will be lending some €2.79 billion for Polish road projects.
  • Polish project causes further legal headaches
    February 28, 2012
    The long tale of woe concerning Poland's troubled A2 highway project looks set to continue with the latest developments in the case.
  • Canadian government offer up to US$535.76mn for US link bridge
    June 19, 2012
    National Post, 12 Jun 2012, online:- Up to US$535.76million (CAD 550mn) has been offered by the Canadian government towards the US$973.75million (CAD 1bn) construction of Detroit River International Crossing bridge between Windsor, Ontario and the US city of Detroit. The construction of the bridge is due for completion by 2016.
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.