Skip to main content

Poland's complex road dispute

The complex legal case between the Polish General Directorate for National Roads and Motorways (GDDKiA) and Austrian contractor Alpine Bau is continuing in the Polish courts.
March 1, 2012 Read time: 2 mins
The complex legal case between the Polish General Directorate for National Roads and Motorways (1361 GDDKiA) and Austrian contractor 1332 Alpine Bau is continuing in the Polish courts. The contractor is asking for some €283 million in compensation for the earlier dispute over the project to build a section of the A1 highway in 2009. Alpine Bau had the contract for the work previously but lost the deal when GDDKiA said the firm was behind schedule and was not meeting the terms of the deal. The contractor responded that the delays were not its fault and also said that it refused to build a bridge as requested by GDDKiA as Alpine Bau's engineers did not believe the structure was safe. The Polish courts then opened the way for the legal case and when the tender for the stretch of the A1 highway was relaunched, Alpine Bau again won the bidding process. This latest development hinges to a great deal on the design of the bridge in question. GDDKiA said that the bridge was safe but Alpine Bau refused to construct this part of the contract and following its initial concerns backed up these by sourcing independent reports, which stated that the design did not meet safety criteria. As the legal cases put forward by both Alpine Bau and GDDKiA will rely on expert opinion over specific technical matters, this may well prove a lengthy and complex process in the courts.

For more information on companies in this article

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Polish tenders worth €4.6 billion to be announced in 2019
    January 11, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) will announce tenders worth around €4.64 billion for construction of around 435km of roads this year. Included will be 172km of the S19 expressway in Podlaskie and Podkarpackie, a 60km stretch of the S7 expressway in Mazowsze and Malopolskie and a 50km section of the S11 expressway in Zachodniopomorskie. Late last year, a Polish parliamentary commission said that it had heard that €11.14 billion of road investment within the 2014-2
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
  • Poland: GDDKiA sets winter road maintenance budget
    October 22, 2014
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c