Skip to main content

Poland's complex road dispute

The complex legal case between the Polish General Directorate for National Roads and Motorways (GDDKiA) and Austrian contractor Alpine Bau is continuing in the Polish courts.
March 1, 2012 Read time: 2 mins
The complex legal case between the Polish General Directorate for National Roads and Motorways (1361 GDDKiA) and Austrian contractor 1332 Alpine Bau is continuing in the Polish courts. The contractor is asking for some €283 million in compensation for the earlier dispute over the project to build a section of the A1 highway in 2009. Alpine Bau had the contract for the work previously but lost the deal when GDDKiA said the firm was behind schedule and was not meeting the terms of the deal. The contractor responded that the delays were not its fault and also said that it refused to build a bridge as requested by GDDKiA as Alpine Bau's engineers did not believe the structure was safe. The Polish courts then opened the way for the legal case and when the tender for the stretch of the A1 highway was relaunched, Alpine Bau again won the bidding process. This latest development hinges to a great deal on the design of the bridge in question. GDDKiA said that the bridge was safe but Alpine Bau refused to construct this part of the contract and following its initial concerns backed up these by sourcing independent reports, which stated that the design did not meet safety criteria. As the legal cases put forward by both Alpine Bau and GDDKiA will rely on expert opinion over specific technical matters, this may well prove a lengthy and complex process in the courts.

For more information on companies in this article

Related Content

  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports