Skip to main content

Poland plans push-starting project

In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.
February 28, 2012 Read time: 2 mins
In the wake of the difficulties in Poland over the withdrawal of Chinese contractor 2487 COVEC from the A2 highway project, the country's government is now looking for a way ahead. In all 16 contractors have been approached by the authorities to negotiate resuming construction work. Among the companies that have been approached by the Polish Government are, 3302 Budimex, 3281 Eurovia, 2861 Hermann Kirchner Polska, 3304 Mostostal Warszawa, 3305 Polimex-Mostostal, 945 Strabag and 2296 Skanska.

The Polish Government is keen for construction to be restarted as soon as possible so that the 30km stretch of the A2 highway between Warsaw and Lodz will be ready before Euro 2012. As a result the authorities are prepared to cut down the time of completing the necessary procedures.

 However, there are legal concerns over whether appointing a contractor without an opening tender process would be questioned by the 2465 European Commission. Meanwhile on a rather more positive note, a loan worth €800 million is being supplied by the 1054 European Investment Bank (EIB) to Poland's Gospodarstwa Krajowego (BGK) bank. This sum will help fund the construction of a 36km section of the A1 highway between Maciejow and Pyrzowice as well as a 135km stretch of the A4 highway between Szarow and Rzeszow.

For more information on companies in this article

Related Content

  • Construction delays affect Bosnian highway project
    May 10, 2012
    In Bosnia, delays have affected the construction work on the country’s key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence. Construction work on a section of the Corridor 5c highway is set to commence by the end of September 2011. The section of highway being built is located in Ljubuska and Capljina, with work staring on the 4km Kravica-Bijaca and due for completion in 10 mon
  • Polish road tender process underway
    November 8, 2019
    The tender process is underway again for a 24km stretch of road in Poland. Motorways (GDDKiA). Offers have so far been received by Budimex, Unibep, Porr and Polaqua, with the lowest bein
  • Better road safety reduces Europe’s casualty figures
    April 1, 2014
    Improving road safety in the EU has resulted in a drop in the fatality rate. Official figures just released show that the number of people killed on Europe's roads fell by 8% in 2013. This follows on from the drop in fatalities of between 2011 and 2012. These provisional figures released by the European Commission provide grounds for optimism and Antonio Avenoso, executive director of the European Transport Safety Council (ETSC) said, “We welcome the reduction in the number of road deaths in Europe last yea
  • European Commission approves Polish S19 dual carriageway project
    February 18, 2016
    The European Commission has approved a project worth almost 150 million for construction of an S19 dual carriageway stretching between Lublin and Rzeszow. The road is part of TEN-T, the Trans-European Transport Networks. Tent-T is a planned set of road, rail, air and water transport networks in the European Union. A decision to adopt TEN-T was made by the European Parliament and Council in 1996. TEN-T projects are mostly funded by national or state governments. Other funding sources include European C