Skip to main content

Poland plans push-starting project

In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.
February 28, 2012 Read time: 2 mins
In the wake of the difficulties in Poland over the withdrawal of Chinese contractor 2487 COVEC from the A2 highway project, the country's government is now looking for a way ahead. In all 16 contractors have been approached by the authorities to negotiate resuming construction work. Among the companies that have been approached by the Polish Government are, 3302 Budimex, 3281 Eurovia, 2861 Hermann Kirchner Polska, 3304 Mostostal Warszawa, 3305 Polimex-Mostostal, 945 Strabag and 2296 Skanska.

The Polish Government is keen for construction to be restarted as soon as possible so that the 30km stretch of the A2 highway between Warsaw and Lodz will be ready before Euro 2012. As a result the authorities are prepared to cut down the time of completing the necessary procedures.

 However, there are legal concerns over whether appointing a contractor without an opening tender process would be questioned by the 2465 European Commission. Meanwhile on a rather more positive note, a loan worth €800 million is being supplied by the 1054 European Investment Bank (EIB) to Poland's Gospodarstwa Krajowego (BGK) bank. This sum will help fund the construction of a 36km section of the A1 highway between Maciejow and Pyrzowice as well as a 135km stretch of the A4 highway between Szarow and Rzeszow.

For more information on companies in this article

Related Content

  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con
  • Polish highway contract
    March 1, 2012
    A new contract has been awarded in Poland to construct a 40km section of the A1 highway.
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.