Skip to main content

Poland plans push-starting project

In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.
February 28, 2012 Read time: 2 mins
In the wake of the difficulties in Poland over the withdrawal of Chinese contractor 2487 COVEC from the A2 highway project, the country's government is now looking for a way ahead. In all 16 contractors have been approached by the authorities to negotiate resuming construction work. Among the companies that have been approached by the Polish Government are, 3302 Budimex, 3281 Eurovia, 2861 Hermann Kirchner Polska, 3304 Mostostal Warszawa, 3305 Polimex-Mostostal, 945 Strabag and 2296 Skanska.

The Polish Government is keen for construction to be restarted as soon as possible so that the 30km stretch of the A2 highway between Warsaw and Lodz will be ready before Euro 2012. As a result the authorities are prepared to cut down the time of completing the necessary procedures.

 However, there are legal concerns over whether appointing a contractor without an opening tender process would be questioned by the 2465 European Commission. Meanwhile on a rather more positive note, a loan worth €800 million is being supplied by the 1054 European Investment Bank (EIB) to Poland's Gospodarstwa Krajowego (BGK) bank. This sum will help fund the construction of a 36km section of the A1 highway between Maciejow and Pyrzowice as well as a 135km stretch of the A4 highway between Szarow and Rzeszow.

For more information on companies in this article

Related Content

  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • Preparations for Polish project – widening work
    December 13, 2018
    Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
  • Work on key Greek highway projects will restart
    December 17, 2012
    Construction work is set to recommence on four highway projects in Greece. The construction work ground to a halt when the country’s economic woes began to bite hard. However the work now looks set to restart in spring 2013 following negotiations between the four consortia involved and the Greek Government. However, construction of highway sections from Trikala to the Egnatia Highway and from Lamia to Xiniada in central Greece and from Patra to Tsakona in the Peloponnese has been postponed. The decision for
  • Bosnia-Herzegovina motorway first
    July 5, 2012
    THE EBRD (European Bank for Reconstruction and Development) is increasing its support for the modernisation of the transport infrastructure of Bosnia-Herzegovina with a €21 million loan for the completion of the construction of the Banja Luka-Gradiska motorway. The motorway, being built with financing from both the EBRD and the European Investment Bank (EIB), is the first in the Republika Srpska, and links the capital Banja Luka with the international transport Corridor X [a pan- European corridor which run