Skip to main content

Poland plans push-starting project

In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.
February 28, 2012 Read time: 2 mins
In the wake of the difficulties in Poland over the withdrawal of Chinese contractor 2487 COVEC from the A2 highway project, the country's government is now looking for a way ahead. In all 16 contractors have been approached by the authorities to negotiate resuming construction work. Among the companies that have been approached by the Polish Government are, 3302 Budimex, 3281 Eurovia, 2861 Hermann Kirchner Polska, 3304 Mostostal Warszawa, 3305 Polimex-Mostostal, 945 Strabag and 2296 Skanska.

The Polish Government is keen for construction to be restarted as soon as possible so that the 30km stretch of the A2 highway between Warsaw and Lodz will be ready before Euro 2012. As a result the authorities are prepared to cut down the time of completing the necessary procedures.

 However, there are legal concerns over whether appointing a contractor without an opening tender process would be questioned by the 2465 European Commission. Meanwhile on a rather more positive note, a loan worth €800 million is being supplied by the 1054 European Investment Bank (EIB) to Poland's Gospodarstwa Krajowego (BGK) bank. This sum will help fund the construction of a 36km section of the A1 highway between Maciejow and Pyrzowice as well as a 135km stretch of the A4 highway between Szarow and Rzeszow.

For more information on companies in this article

Related Content

  • Poland: €7.57bn road budget call
    February 20, 2012
    The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Poland’s GDDKiA promises to improve road procurement processes
    January 12, 2015
    The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b
  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po