Skip to main content

Poland plans push-starting project

In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.
February 28, 2012 Read time: 2 mins
In the wake of the difficulties in Poland over the withdrawal of Chinese contractor 2487 COVEC from the A2 highway project, the country's government is now looking for a way ahead. In all 16 contractors have been approached by the authorities to negotiate resuming construction work. Among the companies that have been approached by the Polish Government are, 3302 Budimex, 3281 Eurovia, 2861 Hermann Kirchner Polska, 3304 Mostostal Warszawa, 3305 Polimex-Mostostal, 945 Strabag and 2296 Skanska.

The Polish Government is keen for construction to be restarted as soon as possible so that the 30km stretch of the A2 highway between Warsaw and Lodz will be ready before Euro 2012. As a result the authorities are prepared to cut down the time of completing the necessary procedures.

 However, there are legal concerns over whether appointing a contractor without an opening tender process would be questioned by the 2465 European Commission. Meanwhile on a rather more positive note, a loan worth €800 million is being supplied by the 1054 European Investment Bank (EIB) to Poland's Gospodarstwa Krajowego (BGK) bank. This sum will help fund the construction of a 36km section of the A1 highway between Maciejow and Pyrzowice as well as a 135km stretch of the A4 highway between Szarow and Rzeszow.

For more information on companies in this article

Related Content

  • Poland tenders for more A2 work between Lodz and Warsaw
    January 8, 2019
    A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Has the promised investment happened?
    July 10, 2012
    At the end of 2008 and the start of 2009, the world's banking system spiralled into crisis, triggered by a series of catastrophic blunders caused by bankers trying to create money from nothing. The result was to plunge the world's economy rapidly into recession. Having proved in effect that lead cannot be turned into gold, the bankers retired on fat pensions leaving governments to pledge huge sums to the banks and fill in the financial gaps.