Skip to main content

Poland increases infrastructure spend

A healthy €865.5 million is being spent on infrastructure projects in Polish capital Warsaw in 2011.
February 21, 2012 Read time: 1 min
A healthy €865.5 million is being spent on infrastructure projects in Polish capital Warsaw in 2011. Of this, a substantial portion will be invested in works to the Trasa Polnocna road.
Meanwhile the Polish Ministry of Infrastructure has said that the €102 million saved in the tender for the construction of a ring road in Augustow in Podlaskie will be reinvested in other road construction projects in the region.
Work is continuing on two sections of the S8 link between Bialystok and Warsaw.

Related Content

  • Qatar's strategy
    February 7, 2012
    Qatar's Public Works Authority is opening the tender process for two key infrastructure projects, with a major focus on highway construction. These tenders include the F-Ring Road project.
  • Nepal's upgraded links
    May 25, 2012
    The Indian Government is providing assistance for road construction work in neighbouring Nepal. This assistance is for building the Kulekhani – Kathmandu road section, which will be widened and upgraded with an asphalt surface. The road will be widened to 7.5m and the work is being carried out by Indian Contractor Golden Goods. Meanwhile asphalt surfacing work is has now been completed on Nepal’s Hetauda-Bhimphedi-Kulekhani-Pharphing-Chaimale road Section. Surfacing work is in hand on the remaining 21km sec
  • A Chinese loan will help develop Macedonia’s roads
    December 4, 2012
    A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road. Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects
  • Trakcja and Mostostal Warszawa pick up S61 deal in Poland
    July 25, 2018
    A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba