Skip to main content

Poland: GDDKiA sets winter road maintenance budget

Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
October 22, 2014 Read time: 2 mins
Poland’s General Directorate for National Roads and Motorways (1361 GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15.

Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads.

Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish capital Warsaw. Building the 18.5km that comprises the three sections is expected to cost nearly $2.03 billion (€1.6 billion).

Also planned is construction of three sections of the S6 express road totalling just over 54km from Goleniow near Szczecin to Koszalin. GDDKiA expects that each section will take up to 37 months to complete. The entire project will cost an estimated $909 million (€718.4 million).

Other planned works are for the $216.5 million (€171 million) Rzeszow to Jaroslaw section of the A4 highway and the $130.4 million (€103 million) S8 dual carriageway between Warsaw and Bialystok.

For more information on companies in this article

Related Content

  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • Go-ahead for Polish tunnel project
    July 5, 2018
    The tunnel project to connect northern Poland’s Uznam and Wolin islands is now getting the go-ahead.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • PB developing I-35 corridor plan
    March 21, 2012
    The City of Austin, Texas, has awarded a contract to Parsons Brinckerhoff for the development of a transportation corridor plan along an 18.5km section of IH 35 in central Austin. A variety of potential highway, transit, bike and pedestrian improvements are anticipated to be generated from a process which will apply a context sensitive process involving a wide range of agency and public stakeholders.