Skip to main content

Poland: GDDKiA sets winter road maintenance budget

Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
October 22, 2014 Read time: 2 mins
Poland’s General Directorate for National Roads and Motorways (1361 GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15.

Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads.

Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish capital Warsaw. Building the 18.5km that comprises the three sections is expected to cost nearly $2.03 billion (€1.6 billion).

Also planned is construction of three sections of the S6 express road totalling just over 54km from Goleniow near Szczecin to Koszalin. GDDKiA expects that each section will take up to 37 months to complete. The entire project will cost an estimated $909 million (€718.4 million).

Other planned works are for the $216.5 million (€171 million) Rzeszow to Jaroslaw section of the A4 highway and the $130.4 million (€103 million) S8 dual carriageway between Warsaw and Bialystok.

For more information on companies in this article

Related Content

  • Italian firm handling Polish contract
    December 14, 2017
    In Poland a road contract worth some €103.74 million will be carried out by Italian firm Impresa Pizzarotti. The project is for a section of the S61 dual carriageway between Lomza Zachod junction and Kolno junction. The tender process was handled by the Polish road authority, GDDKiA.
  • Grupo Rubau awarded a section of Poland’s S-61 Expressway project
    February 5, 2018
    Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
  • Polish road project in legal dispute
    March 9, 2017
    In Poland a legal case is now underway concerning the A4 highway project. The construction firm PBG has launched a case against Poland’s road authority, GDDKiA. The dispute centres on the stretch of the A4 linking Krzyyz and Debica Pustynia. Also involved in the case are the administrator Aprivia, and the contractor SIAC Construction. The contract to build the section of A4 was lost by the contractors in 2012 and the dispute centres on which body was at fault, with substantial claims for payment being made.
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.