Skip to main content

Poland: GDDKiA sets winter road maintenance budget

Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
October 22, 2014 Read time: 2 mins
Poland’s General Directorate for National Roads and Motorways (1361 GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15.

Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads.

Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish capital Warsaw. Building the 18.5km that comprises the three sections is expected to cost nearly $2.03 billion (€1.6 billion).

Also planned is construction of three sections of the S6 express road totalling just over 54km from Goleniow near Szczecin to Koszalin. GDDKiA expects that each section will take up to 37 months to complete. The entire project will cost an estimated $909 million (€718.4 million).

Other planned works are for the $216.5 million (€171 million) Rzeszow to Jaroslaw section of the A4 highway and the $130.4 million (€103 million) S8 dual carriageway between Warsaw and Bialystok.

For more information on companies in this article

Related Content

  • Poland: tendering for Lodz's Western Ring-Road attracts 17 offers
    February 10, 2017
    The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po
  • Polish road tender underway
    February 3, 2015
    Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority GDDKiA. Other bidders included the Porr Polska consortium and a construction consortium comprising contractors Budimex and Strabag.
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.