Skip to main content

Poland: Budimex picks up S3 express road work near Lubin

The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
December 18, 2014 Read time: 2 mins
The Polish construction consortium of 3302 Budimex and 2717 Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw.

The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial.

In early December, Budimex announced it was to build a ring road around the medieval town of Gniezno, about 50km from Poznan, in west-central Poland.

The Gniezno work includes construction of an 18km section of the express road and three interchanges, four bridges and five flyovers along the S5 road, as well as nine flyovers, including one passage for animals.

Construction is to take 22 months, meaning a start by March 2015.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18950 0 oLinkExternal reported in September Visit polish projects provide transport plan Page false /sections/general/news/polish-projects-provide-transport-plan/ false false%> that the government is planning seven transport projects as part of the Connecting Europe Programme.

For more information on companies in this article

Related Content

  • Steering on drums: the Dynapac CG2300 roller
    January 6, 2017
    Having a long tradition of CG rollers, without central articulation, but with steering on drums, Atlas Copco’s Road Construction Equipment division now launches the Dynapac CG2300 asphalt roller. The roller is 3.95m long and 3m high with an inner turning radius of 3.1m. This means transportation advantages as well as ease of working in restricted areas.
  • Steering on drums: the Dynapac CG2300 roller
    March 19, 2013
    Having a long tradition of CG rollers, without central articulation, but with steering on drums, Atlas Copco’s Road Construction Equipment division now launches the Dynapac CG2300 asphalt roller. The roller is 3.95m long and 3m high with an inner turning radius of 3.1m. This means transportation advantages as well as ease of working in restricted areas.
  • VIDEO: Queens University Belfast set record with Meccano bridge
    October 8, 2015
    A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
  • Cape Town venue for the African Road Infrastructure Congress
    May 15, 2018
    The lack of maintenance and investment into road infrastructure has once again raised its head within the African road construction and development sector. This puts pressure on contractors and maintenance teams across everywhere, in turn putting businesses at risk. How to manage road maintenance in today’s economic climate will be the focus of the upcoming African Road Infrastructure and Investment Congress, coming to Cape Town September 4-6. The theme Accelerating Road Development will address the