Skip to main content

Poland: Budimex picks up S3 express road work near Lubin

The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
December 18, 2014 Read time: 2 mins
The Polish construction consortium of 3302 Budimex and 2717 Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw.

The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial.

In early December, Budimex announced it was to build a ring road around the medieval town of Gniezno, about 50km from Poznan, in west-central Poland.

The Gniezno work includes construction of an 18km section of the express road and three interchanges, four bridges and five flyovers along the S5 road, as well as nine flyovers, including one passage for animals.

Construction is to take 22 months, meaning a start by March 2015.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18950 0 oLinkExternal reported in September Visit polish projects provide transport plan Page false /sections/general/news/polish-projects-provide-transport-plan/ false false%> that the government is planning seven transport projects as part of the Connecting Europe Programme.

For more information on companies in this article

Related Content

  • Volvo wheels out loader solution
    April 20, 2015
    Volvo’s new H-Series vehicles offer outstanding fuel efficiency without compromising performance, with the operator having full control over the load for increased safety and productivity.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Bristol, UK: when a parking space is just too small
    May 8, 2015
    People park in the smallest of places, despite the best efforts of urban street designers and town planners to ensure an orderly arrangement of suitably spaced cars. Surly some spaces are just too small to park even the smallest car. But the city of Bristol, in southwest England, has taken no chances and has painted the double yellow ‘no parking’ lines in areas no one in their right mind could squeeze a car. Click here to see just how small the space is that authorities in Bristol have felt they need