Skip to main content

Poland: Budimex picks up S3 express road work near Lubin

The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
December 18, 2014 Read time: 2 mins
The Polish construction consortium of 3302 Budimex and 2717 Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw.

The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial.

In early December, Budimex announced it was to build a ring road around the medieval town of Gniezno, about 50km from Poznan, in west-central Poland.

The Gniezno work includes construction of an 18km section of the express road and three interchanges, four bridges and five flyovers along the S5 road, as well as nine flyovers, including one passage for animals.

Construction is to take 22 months, meaning a start by March 2015.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18950 0 oLinkExternal reported in September Visit polish projects provide transport plan Page false /sections/general/news/polish-projects-provide-transport-plan/ false false%> that the government is planning seven transport projects as part of the Connecting Europe Programme.

For more information on companies in this article

Related Content

  • Start of Torrens section upgrade of Adelaide’s North-South Corridor
    August 12, 2015
    Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr
  • Steering on drums: the Dynapac CG2300 roller
    February 13, 2013
    Having a long tradition of CG rollers, without central articulation, but with steering on drums, Atlas Copco’s Road Construction Equipment division now launches the Dynapac CG2300 asphalt roller. The roller is 3.95m long and 3m high with an inner turning radius of 3.1m. This means transportation advantages as well as ease of working in restricted areas.
  • Recycled pavement use rises again in the US, according to NAPA
    January 16, 2015
    The use of reclaimed asphalt pavement in the United States increased during 2013 after two years of no rise, according the latest report from the US National Asphalt Pavement Association (NAPA). The report found that more than 73 million tons of reclaimed asphalt pavement and 1.7 million tons of reclaimed asphalt roofing shingles were used in new asphalt pavement mixes in the United States during in 2013. Using recycled asphalt material saved about $2 billion in 2013 over the use of virgin materials,
  • LTM1750-9.1 all-terrain crane joins Liebherr line-up
    January 6, 2017
    Liebherr has developed the LTM1750-9.1, a nine-axle all-terrain crane with a maximum lift capacity of 750 tonnes. The 52m telescopic boom machine is carried by the machine and offers a 154m maximum lift height, with a maximum working radius of 112m. A luffing fly jib can be added in 3.5m increments to take maximum lift height to 91m. Weighing in at 108 tonnes in transport configuration, the LTM puts down 12 tonnes per axle. However if the machine’s boom supports are removed the crane can travel at 11 tonnes