Skip to main content

Plans are moving ahead on the new Argentina-Chile tunnel

Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
June 24, 2013 Read time: 3 mins
Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Switzerland and the USA and the contract for the work is expected to be agreed in 2014.

The need for the tunnel is acute as it will replace the treacherous Agua Negra pass, which reaches an altitude of 4,800m and is often blocked in winter. The pass can be dangerous even in good weather due to its narrow, steep and winding roadway and its extreme altitude, which affects vehicles and drivers alike. The roadway of the Agua Negra pass suffers from a poor surface due to the altitude and winter weather conditions and also takes around four hours to negotiate, while it can only be used by cars and is not suitable for heavy vehicles. The main road alternative to the Agua Negra pass at present is the Los Libertadores Tunnel which carries up to 2,500 trucks/day, but that route is at an altitude of 3,200m and is also subject to frequent blockages in winter months. Building the Agua Negra tunnel will help provide a route through central South America that connects the Pacific and Atlantic coasts.

However, the project will by no means be straightforward and will present a number of major challenges to the builder. As the construction of the 14km tunnel will be carried out at altitude and in an area where winter conditions can be severe, these factors by themselves will present a challenge. Geotechnical work has shown that the preferred route does feature faults in the rock, as well as the presence of abrasive rock types that can be hard to bore through. The high altitude location will also present a challenge with regard to adequate ventilation for the tunnel, both during construction and for normal use when it opens to traffic.

The project is of major importance for South America and has been covered in 3260 World Highways before and its progress will be reported on as it moves forward.

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11755 0 oLinkExternal <strong>Agreement between Chile and Argentina on tunnel route</strong> Agreement between Chile and Argentina on tunnel route false /sections/general/news/agreement-between-chile-and-argentina-on-tunnel-route/ false false%>

For more information on companies in this article

Related Content

  • Innovative vacuum trailer system from D-TEC
    January 6, 2017
    Netherlands-based D-TEC has developed a novel vacuum tank trailer system for applications such as bentonite extraction during sample boring. An innovative steering system is said to allow the D-TEC vacuum tanktrailer to manoeuvre easily on sites where there is little space. This design also reduces tyre scrubbing and allows greater tyre life, cutting running costs over the long term. The tank trailer offers greater load capacity than previously available designs according to the firm, due to its low weight,
  • Innovative vacuum trailer system from D-TEC
    January 30, 2013
    Netherlands-based D-TEC has developed a novel vacuum tank trailer system for applications such as bentonite extraction during sample boring. An innovative steering system is said to allow the D-TEC vacuum tanktrailer to manoeuvre easily on sites where there is little space. This design also reduces tyre scrubbing and allows greater tyre life, cutting running costs over the long term. The tank trailer offers greater load capacity than previously available designs according to the firm, due to its low weight,
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • Poland’s GDDKiA promises to improve road procurement processes
    January 12, 2015
    The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b