Skip to main content

Plans are moving ahead on the new Argentina-Chile tunnel

Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
June 24, 2013 Read time: 3 mins
Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Switzerland and the USA and the contract for the work is expected to be agreed in 2014.

The need for the tunnel is acute as it will replace the treacherous Agua Negra pass, which reaches an altitude of 4,800m and is often blocked in winter. The pass can be dangerous even in good weather due to its narrow, steep and winding roadway and its extreme altitude, which affects vehicles and drivers alike. The roadway of the Agua Negra pass suffers from a poor surface due to the altitude and winter weather conditions and also takes around four hours to negotiate, while it can only be used by cars and is not suitable for heavy vehicles. The main road alternative to the Agua Negra pass at present is the Los Libertadores Tunnel which carries up to 2,500 trucks/day, but that route is at an altitude of 3,200m and is also subject to frequent blockages in winter months. Building the Agua Negra tunnel will help provide a route through central South America that connects the Pacific and Atlantic coasts.

However, the project will by no means be straightforward and will present a number of major challenges to the builder. As the construction of the 14km tunnel will be carried out at altitude and in an area where winter conditions can be severe, these factors by themselves will present a challenge. Geotechnical work has shown that the preferred route does feature faults in the rock, as well as the presence of abrasive rock types that can be hard to bore through. The high altitude location will also present a challenge with regard to adequate ventilation for the tunnel, both during construction and for normal use when it opens to traffic.

The project is of major importance for South America and has been covered in 3260 World Highways before and its progress will be reported on as it moves forward.

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11755 0 oLinkExternal <strong>Agreement between Chile and Argentina on tunnel route</strong> Agreement between Chile and Argentina on tunnel route false /sections/general/news/agreement-between-chile-and-argentina-on-tunnel-route/ false false%>

For more information on companies in this article

Related Content

  • GOMACO develops highly versatile compact sidewalk paver
    January 28, 2013
    GOMACO is introducing the GT-3200 sidewalk paver with an adjustable aggregate base mold on the front and a sidewalk paving mold on the rear. This three-track paver is designed for zero-clearance sidewalk rehabilitation projects, to meet a contractor’s unique request. The front-mounted adjustable aggregate base mold spreads the base aggregate for the sidewalk. During the first pass, rock is placed on grade and an auger spreads the material, while three pan vibrators fitted to the mold start compaction. The b
  • Wirtgen Group launches WITOS intelligent telematics system
    January 6, 2017
    The Wirtgen Group is presenting a glimpse of the future of road construction at this year's bauma. Wirtgen Group telematics and on-site solutions (WITOS) combines a telematics fleet management solution with a high-performance software system for process optimisation. WITOS is a modular software system that supports fleet and service management but also enables new approaches to process optimisation. This makes it possible to apply the just-in-time principle to organising construction processes and to optimi
  • Wirtgen Group launches WITOS intelligent telematics system
    April 16, 2013
    The Wirtgen Group is presenting a glimpse of the future of road construction at this year's bauma. Wirtgen Group telematics and on-site solutions (WITOS) combines a telematics fleet management solution with a high-performance software system for process optimisation. WITOS is a modular software system that supports fleet and service management but also enables new approaches to process optimisation. This makes it possible to apply the just-in-time principle to organising construction processes and to optimi
  • California redefines the term carpool
    April 14, 2015
    California is home to many weird and wonderful home-made vehicles, some more useful than other. But few can be as useful as the car pool table car which can do up to 160kph on the freeway. As shown by this – complete with all the double entendres you could wish for – the owner can drive to the beach, park up and proceed to play pool, which apparently attracts a lot of beach bunnies. http://www.msn.com/en-gb/video/watch/video/vi-AAaCRoj?ocid=OutNUK&from=OutNUK&FORM=BWVOLC A late model Chevrolet Mont