Skip to main content

Plans are moving ahead on the new Argentina-Chile tunnel

Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
June 24, 2013 Read time: 3 mins
Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Switzerland and the USA and the contract for the work is expected to be agreed in 2014.

The need for the tunnel is acute as it will replace the treacherous Agua Negra pass, which reaches an altitude of 4,800m and is often blocked in winter. The pass can be dangerous even in good weather due to its narrow, steep and winding roadway and its extreme altitude, which affects vehicles and drivers alike. The roadway of the Agua Negra pass suffers from a poor surface due to the altitude and winter weather conditions and also takes around four hours to negotiate, while it can only be used by cars and is not suitable for heavy vehicles. The main road alternative to the Agua Negra pass at present is the Los Libertadores Tunnel which carries up to 2,500 trucks/day, but that route is at an altitude of 3,200m and is also subject to frequent blockages in winter months. Building the Agua Negra tunnel will help provide a route through central South America that connects the Pacific and Atlantic coasts.

However, the project will by no means be straightforward and will present a number of major challenges to the builder. As the construction of the 14km tunnel will be carried out at altitude and in an area where winter conditions can be severe, these factors by themselves will present a challenge. Geotechnical work has shown that the preferred route does feature faults in the rock, as well as the presence of abrasive rock types that can be hard to bore through. The high altitude location will also present a challenge with regard to adequate ventilation for the tunnel, both during construction and for normal use when it opens to traffic.

The project is of major importance for South America and has been covered in 3260 World Highways before and its progress will be reported on as it moves forward.

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11755 0 oLinkExternal <strong>Agreement between Chile and Argentina on tunnel route</strong> Agreement between Chile and Argentina on tunnel route false /sections/general/news/agreement-between-chile-and-argentina-on-tunnel-route/ false false%>

For more information on companies in this article

Related Content

  • Innovation awards programme announced for Conexpo 2014
    January 28, 2014
    The Conexpo 2014 exhibition is launching its Innovation Awards programme to recognise the best product innovation and engineering. The winners are to be announced at the show and industry participants are being invited to vote online. The awards are intended to spotlight the achievements of show exhibitors in the areas of earthmoving, lifting, road building, compaction and concrete. Industry professionals can vote online to determine the winners. Voters who register have the chance to win a new Microsoft Su
  • Doosan’s powerful new compressor suits duties in extraction markets
    January 31, 2013
    Doosan Portable Power is offering its new large 25/280 portable compressor, which meets Stage IIIB/Tier 4 Interim emission regulations. The 25/280 portable compressor has a free air delivery of 28.3m³/min at a rated operating pressure of 25.1bar. Dual pressure regulation is a standard feature of the 25/280 compressor, allowing it to supply compressed air at operating pressures of both 25.1 or 17.2 bar. Dual pressure regulation expands the scope of applications for the 25/280 compressor which includes poweri
  • Caterpillar bullish despite tough trading conditions
    January 6, 2017
    Caterpillar is performing well despite difficult market conditions in Europe, according to chairman and CEO Doug Oberhelman. The German market is a core operation for the firm. “This is an important market for us. Germany is a competitive market where customers have high expectations,” he said.“At the moment we’ve got a challenging market around the world for our customers and dealers. Businesses face challenges, particularly here in Europe. Emerging nations are seeing faster growth but they also have chall
  • Caterpillar bullish despite tough trading conditions
    April 16, 2013
    Caterpillar is performing well despite difficult market conditions in Europe, according to chairman and CEO Doug Oberhelman. The German market is a core operation for the firm. “This is an important market for us. Germany is a competitive market where customers have high expectations,” he said.“At the moment we’ve got a challenging market around the world for our customers and dealers. Businesses face challenges, particularly here in Europe. Emerging nations are seeing faster growth but they also have chall