Skip to main content

Plans are moving ahead on the new Argentina-Chile tunnel

Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
June 24, 2013 Read time: 3 mins
Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Switzerland and the USA and the contract for the work is expected to be agreed in 2014.

The need for the tunnel is acute as it will replace the treacherous Agua Negra pass, which reaches an altitude of 4,800m and is often blocked in winter. The pass can be dangerous even in good weather due to its narrow, steep and winding roadway and its extreme altitude, which affects vehicles and drivers alike. The roadway of the Agua Negra pass suffers from a poor surface due to the altitude and winter weather conditions and also takes around four hours to negotiate, while it can only be used by cars and is not suitable for heavy vehicles. The main road alternative to the Agua Negra pass at present is the Los Libertadores Tunnel which carries up to 2,500 trucks/day, but that route is at an altitude of 3,200m and is also subject to frequent blockages in winter months. Building the Agua Negra tunnel will help provide a route through central South America that connects the Pacific and Atlantic coasts.

However, the project will by no means be straightforward and will present a number of major challenges to the builder. As the construction of the 14km tunnel will be carried out at altitude and in an area where winter conditions can be severe, these factors by themselves will present a challenge. Geotechnical work has shown that the preferred route does feature faults in the rock, as well as the presence of abrasive rock types that can be hard to bore through. The high altitude location will also present a challenge with regard to adequate ventilation for the tunnel, both during construction and for normal use when it opens to traffic.

The project is of major importance for South America and has been covered in 3260 World Highways before and its progress will be reported on as it moves forward.

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11755 0 oLinkExternal <strong>Agreement between Chile and Argentina on tunnel route</strong> Agreement between Chile and Argentina on tunnel route false /sections/general/news/agreement-between-chile-and-argentina-on-tunnel-route/ false false%>

For more information on companies in this article

Related Content

  • Argentina-Chile Agua Negra tunnel passes key preliminary stage
    February 17, 2015
    The Argentinean Senate is giving preliminary approval for the Agua Negra tunnel project. This is a key stage in the planning for the tunnel, which will link Argentina and Chile. The preliminary stages involve discussing the Maipu Treaty and various procedural agreements between the governments of both countries, an important step forward from the frosty relations between the two nations in the past. Further discussions will be held by the authorities in Argentina while the Chilean Government will be evaluat
  • Chile-Argentina tunnel project to take nine years
    May 3, 2017
    Construction work for the Agua Negra tunnel connecting Argentina with Chile is expected to take nine years to complete. The actual construction work will commence in 2019, although considerable activity will be required beforehand. Building the tunnel is expected to cost in the orders of US$1.5 billion. Much of the financing for the project is being provided by the Inter-American Development Bank (IADB). So far the IADB has given $20 million to Argentina and a further $20 million to Chile to pay for the nec
  • Chile-Argentina tunnelling projects planned
    April 7, 2021
    New tunnelling projects will link Chile and Argentina.
  • Chile-Argentina tunnel project progress
    October 20, 2017
    Further progress is being made with the landmark Agua Negra Tunnel project that will connect Argentina and Chile. The new tunnel will run through the Andes mountain range, providing an improved highway link between the two nations, boosting trade and transport. The consortia pre-qualified for the tender process will be announced during November 2017.