Skip to main content

Plans are moving ahead on the new Argentina-Chile tunnel

Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
June 24, 2013 Read time: 3 mins
Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Switzerland and the USA and the contract for the work is expected to be agreed in 2014.

The need for the tunnel is acute as it will replace the treacherous Agua Negra pass, which reaches an altitude of 4,800m and is often blocked in winter. The pass can be dangerous even in good weather due to its narrow, steep and winding roadway and its extreme altitude, which affects vehicles and drivers alike. The roadway of the Agua Negra pass suffers from a poor surface due to the altitude and winter weather conditions and also takes around four hours to negotiate, while it can only be used by cars and is not suitable for heavy vehicles. The main road alternative to the Agua Negra pass at present is the Los Libertadores Tunnel which carries up to 2,500 trucks/day, but that route is at an altitude of 3,200m and is also subject to frequent blockages in winter months. Building the Agua Negra tunnel will help provide a route through central South America that connects the Pacific and Atlantic coasts.

However, the project will by no means be straightforward and will present a number of major challenges to the builder. As the construction of the 14km tunnel will be carried out at altitude and in an area where winter conditions can be severe, these factors by themselves will present a challenge. Geotechnical work has shown that the preferred route does feature faults in the rock, as well as the presence of abrasive rock types that can be hard to bore through. The high altitude location will also present a challenge with regard to adequate ventilation for the tunnel, both during construction and for normal use when it opens to traffic.

The project is of major importance for South America and has been covered in 3260 World Highways before and its progress will be reported on as it moves forward.

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11755 0 oLinkExternal <strong>Agreement between Chile and Argentina on tunnel route</strong> Agreement between Chile and Argentina on tunnel route false /sections/general/news/agreement-between-chile-and-argentina-on-tunnel-route/ false false%>

For more information on companies in this article

Related Content

  • Five new underground products from Atlas Copco
    April 18, 2013
    Atlas Copco launched five new products for underground construction and mining applications at bauma. The new series of Boomer E rigs features the COP 4038 and the new COP 1800+ series. Both product lines include a new rig control system as well as a new version of Atlas Copco´s Advanced Underground Manager system. This much-improved user interface takes planning and evaluation to the next level in performance and efficiency.
  • NLMK is building its presence in North America
    March 11, 2014
    Belgian steel specialist NLMK said that it is developing its international sales for its high quality products. The firm said that it is having major success in reaching local machinery manufacturers in an array of countries and is building market share. The company offers a range of steels for different applications and specialises in thin plates, offering high tolerances on its plate thicknesses in comparison with its competitors. Niche markets where the company has developed a strong base include abrasio
  • INTERMAT launch for Ammann compaction measurement
    January 6, 2017
    Ammann has introduced the ACEeco compaction measuring system for its five model AVH hydraulic plate range. As an extra cost option, the system uses a compaction display that indicates the compaction progress using an LED scale. The system also displays the maximum compaction level achievable and this, said Ammann, will help operators to avoid making unnecessary passes and over-compaction. Available for AVH5020, 5030, 6020, 6030 and 100-20 models, which have operating weights from 530–555kg and working width
  • INTERMAT launch for Ammann compaction measurement
    April 13, 2012
    Ammann has introduced the ACEeco compaction measuring system for its five model AVH hydraulic plate range. As an extra cost option, the system uses a compaction display that indicates the compaction progress using an LED scale. The system also displays the maximum compaction level achievable and this, said Ammann, will help operators to avoid making unnecessary passes and over-compaction. Available for AVH5020, 5030, 6020, 6030 and 100-20 models, which have operating weights from 530–555kg and working width