Skip to main content

Plans are moving ahead on the new Argentina-Chile tunnel

Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
June 24, 2013 Read time: 3 mins
Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Switzerland and the USA and the contract for the work is expected to be agreed in 2014.

The need for the tunnel is acute as it will replace the treacherous Agua Negra pass, which reaches an altitude of 4,800m and is often blocked in winter. The pass can be dangerous even in good weather due to its narrow, steep and winding roadway and its extreme altitude, which affects vehicles and drivers alike. The roadway of the Agua Negra pass suffers from a poor surface due to the altitude and winter weather conditions and also takes around four hours to negotiate, while it can only be used by cars and is not suitable for heavy vehicles. The main road alternative to the Agua Negra pass at present is the Los Libertadores Tunnel which carries up to 2,500 trucks/day, but that route is at an altitude of 3,200m and is also subject to frequent blockages in winter months. Building the Agua Negra tunnel will help provide a route through central South America that connects the Pacific and Atlantic coasts.

However, the project will by no means be straightforward and will present a number of major challenges to the builder. As the construction of the 14km tunnel will be carried out at altitude and in an area where winter conditions can be severe, these factors by themselves will present a challenge. Geotechnical work has shown that the preferred route does feature faults in the rock, as well as the presence of abrasive rock types that can be hard to bore through. The high altitude location will also present a challenge with regard to adequate ventilation for the tunnel, both during construction and for normal use when it opens to traffic.

The project is of major importance for South America and has been covered in 3260 World Highways before and its progress will be reported on as it moves forward.

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11755 0 oLinkExternal <strong>Agreement between Chile and Argentina on tunnel route</strong> Agreement between Chile and Argentina on tunnel route false /sections/general/news/agreement-between-chile-and-argentina-on-tunnel-route/ false false%>

For more information on companies in this article

Related Content

  • Golden opportunity at AAPA 2015 International Flexible Pavements Conference
    August 19, 2015
    In just under four weeks, on Australia’s Gold Coast, the best minds in the global flexible pavement industry will gather for the Australian Asphalt Pavement Association’s 2015 International Flexible Pavements Conference. Experts will be presenting the most up-to-date technical information as well as real life examples of applied technology to projects, whether they be roads, tunnels, ports or airports. “This is a must-attend event for all in road construction and maintenance,” said Michael Caltabiano,
  • Bauma 2016 Innovation Awards entries accepted starting today
    April 1, 2015
    Entries are now open for the bauma Innovation Awards to be presented at the international construction and construction equipment trade fair bauma in Munich in 2016. As last time, in 2016 the awards are again being presented in five categories: • Machinery • Components • Construction process/Construction work • Research • Design bauma 2016 in Munich is a major international showcase for construction machinery, building material machines, mining machines, construction vehicles and c
  • Kleemann showcases Mobicat MC 100 R jaw crusher
    January 6, 2017
    Kleemann will showcase the Mobicat MC 100 R mobile jaw crusher from its successful Contractor Line. Weighing approximately 36tonnes it is relatively easy to transport and thus also ideal for smaller jobs, and there is the option to lower the crushing unit hydraulically to a height of 3,200mm for transport purposes. The powerful diesel engine with 228kW, together with the hydraulic crusher drive, ensures maximum feed capacity of up to 200 tonnes/hour, says Kleemann. The MC 100 R has sufficient power reserve
  • Kleemann showcases Mobicat MC 100 R jaw crusher
    April 12, 2012
    Kleemann will showcase the Mobicat MC 100 R mobile jaw crusher from its successful Contractor Line. Weighing approximately 36tonnes it is relatively easy to transport and thus also ideal for smaller jobs, and there is the option to lower the crushing unit hydraulically to a height of 3,200mm for transport purposes. The powerful diesel engine with 228kW, together with the hydraulic crusher drive, ensures maximum feed capacity of up to 200 tonnes/hour, says Kleemann. The MC 100 R has sufficient power reserve