Skip to main content

PIARC extends its XXVth World Road Congress 2016 call for papers deadline

The World Road Association (PIARC) has extended its submission deadline to Wednesday October 15 for papers at the XXVth World Road Congress, due to be held in Seoul, South Korea, from November 2 to 6 2015. Proposed papers will be reviewed by the PIARC Technical Committees and those that are accepted will be published in the congress proceedings. Also, “all authors of accepted papers will present their work and results at interactive poster sessions,” says PIARC. “Some outstanding contributions will be sele
October 8, 2014 Read time: 2 mins
The World Road Association (3141 PIARC) has extended its submission deadline to Wednesday October 15 for papers at the XXVth World Road Congress, due to be held in Seoul, South Korea, from November 2 to 6 2015.

Proposed papers will be reviewed by the PIARC Technical Committees and those that are accepted will be published in the congress proceedings. Also, “all authors of accepted papers will present their work and results at interactive poster sessions,” says PIARC. “Some outstanding contributions will be selected for an oral presentation during the Congress.”

And, the association adds, “by submitting a paper in response to the present call for papers you will automatically be entered in the PIARC Prizes competition and be in contention to win one of the eight prizes.” The categories are:

•Young professionals (paper presented by authors all less than 30 years of age);

•Developing countries (paper presented by authors from countries of low income and lower-middle income economies according to the classification established by the World Bank in 2014);

•Best innovation (Maurice Milne medal);

•Safety of road users and road workers;

•Sustainable development;

•Road design and road construction;

•Road maintenance and operation;

•Roads and intermodality.

For each paper selected for a prize, PIARC will pay the travel expenses, accommodation and the registration fees to the Congress for one of the co-authors of the paper. “All papers must be original work available to be released for publication,” says PIARC. “Material that has been previously published will not be accepted. Any reference of a political, commercial or advertising nature must be excluded from the papers. The indication of a brand name should be excluded in the title and in the abstract. Abstracts should be submitted in one of the official languages of the Association: English or French. The abstract should not exceed 400 words.”

For more information got to %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal PIARC Prizes 2015 Visit piarc seoul 2015 page false http://www.piarcseoul2015.org/wrcs/papers/call false false%> page

For more information on companies in this article

Related Content

  • Italy at bauma 2013
    January 6, 2017
    Italian construction equipment manufacturers will be in abundance at bauma 2013, showcasing their impressive range of machines and technologies based on a rich and proud history of engineering excellence. The Munich-based show’s status as the largest construction equipment industry exhibition in the world represents the perfect platform for Italian firms to increase their customer base and enhance their global standing. The timing of bauma 2013, with all its associated trading and networking opportunities,
  • Italy at bauma 2013
    April 8, 2013
    Italian construction equipment manufacturers will be in abundance at bauma 2013, showcasing their impressive range of machines and technologies based on a rich and proud history of engineering excellence. The Munich-based show’s status as the largest construction equipment industry exhibition in the world represents the perfect platform for Italian firms to increase their customer base and enhance their global standing. The timing of bauma 2013, with all its associated trading and networking opportunities,
  • Penta’s custom-made plant flexibility
    April 8, 2013
    Penta Automazioni Industriali says it began trading in 1991 in response to increased demand for automation in the handling, stacking, sorting and ageing of concrete elements. The company provides custom-made plants and, through a close relationship with customers, Penta says it is able to continuously improve its products and adapt them to constantly changing market demands.
  • Tenders open for England’s A66 northern trans-Pennine route
    October 31, 2019
    A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of