Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
April 18, 2013 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Productive shredding of materials for recycling from the ZB Group
    March 15, 2013
    The powerful THOR 1721K from the ZB Group in Spain offers high production shredding of materials for recycling purposes. This sophisticated, self-propelled, heavy duty, mobile hammer shredder unit is a high performance, autonomous machine that can shred and recycle ferrous and non-ferrous materials, reinforced concrete, and some other materials also.
  • Improved access technology from Ruthmann
    January 6, 2017
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Improved access technology from Ruthmann
    January 31, 2013
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Our new screening buckets won’t clog, says Allu
    January 6, 2017
    Allu has added three new models to its range of screening buckets. The Allu DL series has been designed for excavators between 4 and 12tonnes and loaders between 2 and 8tonnes. The design of the DL series bucket’s top screen ensures that it won’t clog, even with wet materials, according to the manufacturer. The screening blades and top screens can be changed to vary the size of the end product, which is dependent on the spacing between the combs.