Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
April 18, 2013 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • REMU launches Combi E8 screening plant
    April 16, 2013
    Finnish company Remu has launched its new screening plant, the Remu Combi E8. A non-clogging screening plant for preparing topsoil and processing various waste materials, the re-engineered solutions have increased screening capacity by a wider 950mm screening table and a new 2.6m3 feeder unit.
  • Case’s 621F wheeled loader makes European show bow at bauma
    January 6, 2017
    Case’s 12.2tonne 621F wheeled loader will make its first appearance at a European show during bauma. Powered by a second generation common-rail Tier 4 interim engine and benefiting from the use of fuel saving SCR technology, the 621F is said to have proven ZF auto powershift transmission and heavy duty axles. The model is also equipped with a 100% locking front differential for maximum traction and reduced tyre wear. Similar to other larger Case F Series wheeled loaders, the 621F has a cooling pack directly
  • Case’s 621F wheeled loader makes European show bow at bauma
    February 7, 2013
    Case’s 12.2tonne 621F wheeled loader will make its first appearance at a European show during bauma. Powered by a second generation common-rail Tier 4 interim engine and benefiting from the use of fuel saving SCR technology, the 621F is said to have proven ZF auto powershift transmission and heavy duty axles. The model is also equipped with a 100% locking front differential for maximum traction and reduced tyre wear. Similar to other larger Case F Series wheeled loaders, the 621F has a cooling pack directly
  • Yanmar will show complete line of Tier 4 Final engines, along with an electronic diagnostic system
    January 6, 2017
    Engine supplier Yanmar will show a full range of California Air Resources Board (CARB) certified engines at Bauma. The company claims to be the first engine manufacturer to achieve the CARB accreditation across its complete line-up in the 19-56kW (25-75hp) range, and the engines all meet the US Tier 4 Final standard too. The firm will also announce an electronic diagnostic service system called Smart Assist-Direct. The system allows rapid updates of engine software and can automatically retrieve technical s