Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
April 18, 2013 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G
  • Bell will push the boundaries in ADT design
    February 6, 2013
    Bell Equipment is working on its biggest ever truck, which will offer a capacity of 55tonnes. A launch date has not yet been revealed for the hauler and technical details have yet to be revealed, however the machine will have a 4x4 drive system. Marc Schürmann managing director of Bell Equipment Europe said prototype testing for the machine will commence later this year. He said “Our competitors will be the smaller class of rigid haulers,” and he added that the aim is to offer lower fuel consumption and cap
  • Volvo CE president speaks of industry giant’s goals for bauma 2013
    January 6, 2017
    Volvo Construction Equipment president Pat Olney has stressed the importance of the bauma show to the industry giant ahead of the 2013 event. Speaking during the recent inauguration of Volvo CE’s new Americas HQ in Shippensburg, Pennsylvania, he said: “Bauma is a major show in Europe and also attracts international visitors.
  • Volvo CE president speaks of industry giant’s goals for bauma 2013
    April 9, 2013
    Volvo Construction Equipment president Pat Olney has stressed the importance of the bauma show to the industry giant ahead of the 2013 event. Speaking during the recent inauguration of Volvo CE’s new Americas HQ in Shippensburg, Pennsylvania, he said: “Bauma is a major show in Europe and also attracts international visitors.