Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
April 18, 2013 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Saltec brand Torgar is offering innovative access solutions
    January 6, 2017
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • Saltec brand Torgar is offering innovative access solutions
    March 27, 2013
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.
  • Getech’s versatile sludge treatment solution
    April 5, 2013
    Due to an innovative and strong frame design and the use of premium raw materials and components, Getech/Gennaretti centrifuges can be employed across mining, tunnelling, petroleum and chemical industry-based sludge treatment processes. They can also be built in mobile plants on containers, easy to transport to remote areas and quick to install, able to manage sludge volumes going from 5 to 150m³ per hour.