Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
January 6, 2017 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • MOBA launches two-in-one compact machine control system
    January 6, 2017
    Three-dimensional technology is playing an increasingly important role on construction sites around the world but there are still projects for which there is no 3D data and the use of a 2D system makes more sense for machine control. With the new 3D-matic, MOBA offers a precise and flexible 3D levelling system for graders, dozers and blades that can also be used as a 2D system if necessary. MOBA 3D-matic increases efficiency in machine use and contributes to fast and precise project execution. The compact t
  • MOBA launches two-in-one compact machine control system
    April 15, 2013
    Three-dimensional technology is playing an increasingly important role on construction sites around the world but there are still projects for which there is no 3D data and the use of a 2D system makes more sense for machine control. With the new 3D-matic, MOBA offers a precise and flexible 3D levelling system for graders, dozers and blades that can also be used as a 2D system if necessary. MOBA 3D-matic increases efficiency in machine use and contributes to fast and precise project execution. The compact t
  • Leica Geosystems launches iCON for wheeled loaders
    January 6, 2017
    Leica Geosystems has unveiled its new powerful Leica iCON 3D machine control system for wheeled loaders. The Swiss firm says the system allows users to complete their earthworks jobs faster and correctly the first time. It is also said to precisely control material cut and fill, saving a lot of time and money by reducing rework and over-excavation, while also making grading operations with wheeled loaders more efficient. Grade checking, says Leica, can be eliminated, further enhancing productivity, efficien