Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
January 6, 2017 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • JCB emissions compliant engines to launch in wheeled loaders
    February 8, 2013
    JCB will launch 427 and 437 wheeled loaders at Bauma, powered by Stage IIIB/Tier 4 Interim Cummins engines. First seen in prototype form at last year’s Intermat show, the two loaders are powered by the Cummins QSB6.7 engine, which offers a 9.4% increase in torque over the previous model. This drives through a lock-up converter and customers can choose a standard four-speed or optional five-speed transmission, which delivers a 16% drop in fuel consumption. In-cab noise levels have been reduced to just 68dB(A
  • BLS showcases its trackpad systems
    January 6, 2017
    Trackpads made by BLS Enterprises for use on Wirtgen milling machines have had their first bauma outing. Component specialist BLS Enterprises is offering a durable replacement track that is a direct replacement for the EPS system. Its distinctive range of blue-coloured pads has been developed to last 15% to 30% longer than conventional polyurethane units. “We want to be known as the people who make the blue pads,” said BLS president Barry Stoughton. Blue pads are the longest-lasting pads, he said. The two-p
  • BLS showcases its trackpad systems
    April 19, 2013
    Trackpads made by BLS Enterprises for use on Wirtgen milling machines have had their first bauma outing. Component specialist BLS Enterprises is offering a durable replacement track that is a direct replacement for the EPS system. Its distinctive range of blue-coloured pads has been developed to last 15% to 30% longer than conventional polyurethane units. “We want to be known as the people who make the blue pads,” said BLS president Barry Stoughton. Blue pads are the longest-lasting pads, he said. The two-p
  • A new grader and dozer control system is offered by MOBA
    January 6, 2017
    MOBA is offering a sophisticated control system for use with bulldozers and graders available in both 2D and 3D format. The company says that its 3D-matic package offers precise and versatile levelling control for graders and dozers and which can also be used as a 2D system if necessary. Marketing manager Christine Seidel said, “This system moves the blade. Our mindset is to make it easy to use for the operator. It’s different from the competition which focus on tonnages as this is focussed on the machine a