Skip to main content

PERI unveils VARIOKIT heavy-duty truss girder

PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
January 6, 2017 Read time: 2 mins
Bernhard Lindner, product management civil engineer at PERI, has been highlighting the benefits of the bauma 2013 launched VARIOKIT heavy-duty truss girder
298 PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction.

A supplement to the VARIOKIT heavy-duty shoring tower launched at 688 Bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work.

The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity. With the continuously adjustable telescopic support frame, PERI says all spans can be realised with centimetre accuracy. Furthermore, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by fitting pins.

PERI claims the compatibility with the VARIOKIT heavy-duty shoring tower through the Main Beam VRB provides ideal solutions in the heavy-duty shoring sector. Meanwhile, the optional PERI UP scaffolding in the bottom section provides, says the company, totally safe working conditions.

“We are going way beyond capacity of existing systems,” said Bernhard Lindner, product management civil engineer at PERI. “We can go up to 3,000kNm as a maximum bending moment. We want to work on spans up to 35 metres as a standard use. We also intend to go up to 40 metres.”

Lindner said Eastern Europe and North America were likely to be strong markets for the new heavy-duty truss girder solution. “We also have some clients from Serbia. They have looked at the solution and said ‘We want to redesign our bridge to make it more suitable for your system’,” he added.

In combination with the VARIOKIT heavy-duty shoring tower,  the new VARIOKIT heavy-duty truss girder will be piloted at T4 – a 390m arched bridge being used to close the gap between Paradisia and Tsakona on the 160km A7 motorway in Greece. The bridge is due to be completed in early 2014.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.Peri.de www.Peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Merlo’s ripe telehandler
    April 10, 2012
    The 40.30 MCSS is one of two recently launched Merlo telehandlers being shown at INTERMAT 2012. It features a larger chassis and offers a 30metre lift height with a four tonne capacity, compared to fellow INTERMAT model the ‘Grand’ Roto 60.24 MCSS and its 24metre lift and six tonne capacity.
  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    January 6, 2017
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required
  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    April 17, 2013
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required
  • Far from formulaic
    January 6, 2017
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on