Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
February 3, 2012 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Sateco launches lift shaft podium
    April 12, 2012
    Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
  • Preview Intermat News, latest news for Intermat 2012 before the show opens.
    January 6, 2017
    Intermat Preview News, latest news for Intermat 2012 before the show opens. Four leading business-to-business magazines are working together to bring you the latest Preview News and live content Intermat News from the Daily News website for Intermat 2012: World Highways, Aggregates Business Europe, Construction Equipment from the US, and CMTM (Construction Machinery Technology & management) from China, bring their collective editorial expertise together for Intermat news and products in 2012. The te
  • Preview Intermat News, latest news for Intermat 2012 before the show opens.
    March 30, 2012
    Intermat Preview News, latest news for Intermat 2012 before the show opens. Four leading business-to-business magazines are working together to bring you the latest Preview News and live content Intermat News from the Daily News website for Intermat 2012: World Highways, Aggregates Business Europe, Construction Equipment from the US, and CMTM (Construction Machinery Technology & management) from China, bring their collective editorial expertise together for Intermat news and products in 2012. The te
  • Golden moment at INTERMAT ribbon cutting ceremony
    January 6, 2017
    Monsieur Bernard Accoyer, the president of the French National Assembly, officially opened INTERMAT 2012 with a traditional ribbon cutting ceremony. Equipped with gold-plated scissors, M Accoyer paused for the media before slicing through the tricolour ribbon on his way to an extensive 90-minute tour of the show’s exhibition halls, to savour all that the construction industry has to offer.