Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
January 6, 2017 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • INTERMAT reveal for more Case F-series wheeled loaders
    January 6, 2017
    Case Construction Equipment has expanded its F Series wheeled loader range with the introduction of the 521F and 621F. Using a central cooling pack design and rear-mounted engine layout, Case said these two models bring new levels of performance to the loader market. With bucket capacities of 3.2tonnes and 4.3tonnes
  • INTERMAT reveal for more Case F-series wheeled loaders
    March 16, 2012
    Case Construction Equipment has expanded its F Series wheeled loader range with the introduction of the 521F and 621F. Using a central cooling pack design and rear-mounted engine layout, Case said these two models bring new levels of performance to the loader market. With bucket capacities of 3.2tonnes and 4.3tonnes
  • Yanmar launches SV100-1 excavator at INTERMAT
    January 6, 2017
    Launched at INTERMAT in prototype form, the SV100-1 is now Yanmar’s largest excavator. Tipping the scales at 10.3tonnes, the reduced tailswing midi excavator gets a two-piece boom and additional counterweight. Powered by a 54.7kW 4TNV98T engine, the excavator offers a 4.48m dig depth, sits on 450mm wide rubber tracks, and measures 2.3m wide. A fourth auxiliary circuit is available as an option.
  • Yanmar launches SV100-1 excavator at INTERMAT
    April 16, 2012
    Launched at INTERMAT in prototype form, the SV100-1 is now Yanmar’s largest excavator. Tipping the scales at 10.3tonnes, the reduced tailswing midi excavator gets a two-piece boom and additional counterweight. Powered by a 54.7kW 4TNV98T engine, the excavator offers a 4.48m dig depth, sits on 450mm wide rubber tracks, and measures 2.3m wide. A fourth auxiliary circuit is available as an option.