Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
January 6, 2017 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Zoomlion’s new tower crane offers high lifting performance
    January 6, 2017
    Zoomlion is now offering a novel new tower crane model that complies will all CE requirements. This is the first crane model Zoomlion has developed following its acquisition of a German specialist in 2011. Lifting capacity is said to be good for this class of machine, which offers high performance and productivity and also comes with an array of safety features. The crane structure is said to be extremely strong and able to cope with repeated load cycles, allowing a long working life.
  • Zoomlion’s new tower crane offers high lifting performance
    April 2, 2012
    Zoomlion is now offering a novel new tower crane model that complies will all CE requirements. This is the first crane model Zoomlion has developed following its acquisition of a German specialist in 2011. Lifting capacity is said to be good for this class of machine, which offers high performance and productivity and also comes with an array of safety features. The crane structure is said to be extremely strong and able to cope with repeated load cycles, allowing a long working life.
  • Palfinger launches 30m truck-mounted platform
    January 6, 2017
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • Palfinger launches 30m truck-mounted platform
    April 19, 2012
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.