Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
January 6, 2017 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Golden moment at INTERMAT ribbon cutting ceremony
    April 17, 2012
    Monsieur Bernard Accoyer, the president of the French National Assembly, officially opened INTERMAT 2012 with a traditional ribbon cutting ceremony. Equipped with gold-plated scissors, M Accoyer paused for the media before slicing through the tricolour ribbon on his way to an extensive 90-minute tour of the show’s exhibition halls, to savour all that the construction industry has to offer.
  • TowerLight moves into the security market
    January 6, 2017
    TowerLight is increasing its presence in the site security market with the launch of the Security Tower. Based on the firm’s four-head LED lighting tower, the machine is equipped with a wireless camera system that can provide secure video of the site in daylight and at night. The tower is currently available on a skid base, with fork pockets and crane hook, but will also be produced on a wheeled chassis.
  • TowerLight moves into the security market
    April 20, 2012
    TowerLight is increasing its presence in the site security market with the launch of the Security Tower. Based on the firm’s four-head LED lighting tower, the machine is equipped with a wireless camera system that can provide secure video of the site in daylight and at night. The tower is currently available on a skid base, with fork pockets and crane hook, but will also be produced on a wheeled chassis.
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t