Skip to main content

Peri launched UP MDS Formwork at INTERMAT 2012

Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
February 3, 2012 Read time: 2 mins
Peri UP MDS formwork live at INTERMAT 2012
298 PERI is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012.

The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs).

The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of the platform is divided by 2, with the heaviest item weighing 16kg) by systemising the erection and the dismantling operations, and by reducing unnecessary movements, bad postures and, as a result, the risk of MSDs.

The optimisation of safety and ergonomics are, according to Peri, what differentiate the UP MDS from all other solutions currently on the market.

Despite the tough global economic climate, Stéphanie Derouet, management assistant at Peri, said that company product sales had gone up since 2010.

“Poland is a booming market and Ukraine is also good, partly because of the need to build new facilities for Euro 2012,” said Derouet.

“We also provide the tunnel formwork for the Panama Canal works. It’s the biggest contact Peri has. Work is being done to make the Canal bigger to allow bigger boats access.”

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • BLS Enterprises is offering new milling machine trackpads
    April 11, 2013
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • Terex launches Superlift 3800 crawler crane
    January 6, 2017
    Terex Cranes has replaced its CC2800-1 crawler crane with the Superlift 3800 lattice boom, offering improved speed and efficiency for customers. The 3800 can handle loads of up to 650tonnes at a radius of 5-12m and has a maximum load moment of 8,426t/m. Terex says that customers have been involved in the new crane’s development from the start, resulting in improvements in many areas. The crane uses the Terex Crane Fall Protection System, with additional railings installed around the superstructure. It is th
  • Terex launches Superlift 3800 crawler crane
    April 18, 2013
    Terex Cranes has replaced its CC2800-1 crawler crane with the Superlift 3800 lattice boom, offering improved speed and efficiency for customers. The 3800 can handle loads of up to 650tonnes at a radius of 5-12m and has a maximum load moment of 8,426t/m. Terex says that customers have been involved in the new crane’s development from the start, resulting in improvements in many areas. The crane uses the Terex Crane Fall Protection System, with additional railings installed around the superstructure. It is th
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.