Skip to main content

Peri launched UP MDS Formwork at INTERMAT 2012

Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
February 3, 2012 Read time: 2 mins
Peri UP MDS formwork live at INTERMAT 2012
298 PERI is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012.

The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs).

The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of the platform is divided by 2, with the heaviest item weighing 16kg) by systemising the erection and the dismantling operations, and by reducing unnecessary movements, bad postures and, as a result, the risk of MSDs.

The optimisation of safety and ergonomics are, according to Peri, what differentiate the UP MDS from all other solutions currently on the market.

Despite the tough global economic climate, Stéphanie Derouet, management assistant at Peri, said that company product sales had gone up since 2010.

“Poland is a booming market and Ukraine is also good, partly because of the need to build new facilities for Euro 2012,” said Derouet.

“We also provide the tunnel formwork for the Panama Canal works. It’s the biggest contact Peri has. Work is being done to make the Canal bigger to allow bigger boats access.”

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Zoomlion to introduce full line of CE-marked tower cranes
    January 6, 2017
    Chinese manufacturer Zoomlion will have a full range of CE-marked flat-topped tower cranes by the middle of next year. Following its buy-out of JOST’s flat top crane technology in 2011, Zoomlion is planning to market CE-marked range of 20 tower cranes. The first to market is the mid-sized T320-16, which was launched at INTERMAT. This will shortly be followed by a small-sized crane and then by the extra small crane at the end of the year, with the full range becoming available by June 2013
  • Zoomlion to introduce full line of CE-marked tower cranes
    April 17, 2012
    Chinese manufacturer Zoomlion will have a full range of CE-marked flat-topped tower cranes by the middle of next year. Following its buy-out of JOST’s flat top crane technology in 2011, Zoomlion is planning to market CE-marked range of 20 tower cranes. The first to market is the mid-sized T320-16, which was launched at INTERMAT. This will shortly be followed by a small-sized crane and then by the extra small crane at the end of the year, with the full range becoming available by June 2013
  • HMK300LC dominates Hidromek’s INTERMAT stand
    January 6, 2017
    Dominating Hidromek’s stand at INTERMAT is its 30.5tonne HMK300LC excavator. In common with the other gen series excavators, the HMK300LC has Hidromek’s latest cab design, which offers more room for the operator and the “Opera” user interface designed to optimise the excavator’s force, speed and consumption.
  • HMK300LC dominates Hidromek’s INTERMAT stand
    April 20, 2012
    Dominating Hidromek’s stand at INTERMAT is its 30.5tonne HMK300LC excavator. In common with the other gen series excavators, the HMK300LC has Hidromek’s latest cab design, which offers more room for the operator and the “Opera” user interface designed to optimise the excavator’s force, speed and consumption.