Skip to main content

Peri launched UP MDS Formwork at INTERMAT 2012

Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
February 3, 2012 Read time: 2 mins
Peri UP MDS formwork live at INTERMAT 2012
298 PERI is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012.

The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs).

The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of the platform is divided by 2, with the heaviest item weighing 16kg) by systemising the erection and the dismantling operations, and by reducing unnecessary movements, bad postures and, as a result, the risk of MSDs.

The optimisation of safety and ergonomics are, according to Peri, what differentiate the UP MDS from all other solutions currently on the market.

Despite the tough global economic climate, Stéphanie Derouet, management assistant at Peri, said that company product sales had gone up since 2010.

“Poland is a booming market and Ukraine is also good, partly because of the need to build new facilities for Euro 2012,” said Derouet.

“We also provide the tunnel formwork for the Panama Canal works. It’s the biggest contact Peri has. Work is being done to make the Canal bigger to allow bigger boats access.”

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Deutz working on hybrid projects for excavators and loaders
    April 16, 2013
    Deutz used bauma to show two hybrid projects it is currently working on, including a hybrid drive for excavators and an innovative start/stop system for compact wheeled loaders. The hybrid drive is based on using a 160kW Deutz TCD 6.1 L6 engine with an integrated motor-generator. The engine is linked to an on-board electrical power network that uses super capacitors, a power inverter and an electric slew motor, allowing components to harvest, store and use electrical energy, specifically for slewing functio
  • MTU fills power gap with 1600 series engines
    April 17, 2013
    Torgnum Group used bauma 2013 to reveal its new MTU 1600 Series engine platform, developed specifically for off-highway use, that meets EPA Tier 4 Final emissions requirements. In 17.5litre capacity V10 format and 21litre V12, the two new diesel engines span a power range from 567kW-730kW, and provide peak torque figures of 3,500Nm and 4,200Nm respectively. “These two new engine formats slot into our range between the 1500 Series and the 2000 Series engine ranges,” said Mirko Gutemann, Tognum Group marketin
  • MTU fills power gap with 1600 series engines
    January 6, 2017
    Torgnum Group used bauma 2013 to reveal its new MTU 1600 Series engine platform, developed specifically for off-highway use, that meets EPA Tier 4 Final emissions requirements. In 17.5litre capacity V10 format and 21litre V12, the two new diesel engines span a power range from 567kW-730kW, and provide peak torque figures of 3,500Nm and 4,200Nm respectively. “These two new engine formats slot into our range between the 1500 Series and the 2000 Series engine ranges,” said Mirko Gutemann, Tognum Group marketin
  • MTU fills power gap with 1600 series engines
    April 17, 2013
    Torgnum Group used bauma 2013 to reveal its new MTU 1600 Series engine platform, developed specifically for off-highway use, that meets EPA Tier 4 Final emissions requirements. In 17.5litre capacity V10 format and 21litre V12, the two new diesel engines span a power range from 567kW-730kW, and provide peak torque figures of 3,500Nm and 4,200Nm respectively. “These two new engine formats slot into our range between the 1500 Series and the 2000 Series engine ranges,” said Mirko Gutemann, Tognum Group marketin