Skip to main content

Pennsylvania $1 million grant for turnpike EV infrastructure

The Pennsylvania Department of Environmental Protection has announced a US$1 million grant award to help develop electric vehicle infrastructure on the Pennsylvania Turnpike. The grant recipient, Car Charging Group, will install charging stations at 17 Turnpike service plazas. Level II charging stations, which can charge a car in roughly four hours, and Level III charging stations, which can charge a car in about 20 minutes, will be installed at the service plazas in three phases. The first phase of the
April 19, 2012 Read time: 1 min
The 5052 Pennsylvania Department of Environmental Protection has announced a US$1 million grant award to help develop electric vehicle infrastructure on the Pennsylvania Turnpike. The grant recipient, Car Charging Group, will install charging stations at 17 Turnpike service plazas. Level II charging stations, which can charge a car in roughly four hours, and Level III charging stations, which can charge a car in about 20 minutes, will be installed at the service plazas in three phases.

The first phase of the work will be incorporated into on-going service-plaza renovations between Harrisburg and New Jersey. Later phases will involve service plazas between Harrisburg and Ohio, and then along the Northeastern Extension. The project is expected to be completed by June, 2013.

The Turnpike Commission has also committed up to $500,000 in electric upgrades at the plazas to provide the charging stations with the necessary voltage

For more information on companies in this article

Related Content

  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Methanol range extender for fuel cell vehicle
    July 9, 2012
    The innovative QBREAK electric car is to benefit from a sophisticated methanol fuel cell range extender. Development work is being carried out on the project by a consortium of Danish companies. The plan is to develop a novel, range-extended electric vehicle that uses biomethanol as a fuel source. TheModularEnergyCarrier concept (MECc) project has just been granted funding from the Danish government. The reworked electric car is expected to deliver high market potential due to a competitive price and specif
  • New New York-Newark, New Jersey bridge connection
    November 25, 2013
    US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York. The Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross t