Skip to main content

Pennsylvania $1 million grant for turnpike EV infrastructure

The Pennsylvania Department of Environmental Protection has announced a US$1 million grant award to help develop electric vehicle infrastructure on the Pennsylvania Turnpike. The grant recipient, Car Charging Group, will install charging stations at 17 Turnpike service plazas. Level II charging stations, which can charge a car in roughly four hours, and Level III charging stations, which can charge a car in about 20 minutes, will be installed at the service plazas in three phases. The first phase of the
April 19, 2012 Read time: 1 min
The 5052 Pennsylvania Department of Environmental Protection has announced a US$1 million grant award to help develop electric vehicle infrastructure on the Pennsylvania Turnpike. The grant recipient, Car Charging Group, will install charging stations at 17 Turnpike service plazas. Level II charging stations, which can charge a car in roughly four hours, and Level III charging stations, which can charge a car in about 20 minutes, will be installed at the service plazas in three phases.

The first phase of the work will be incorporated into on-going service-plaza renovations between Harrisburg and New Jersey. Later phases will involve service plazas between Harrisburg and Ohio, and then along the Northeastern Extension. The project is expected to be completed by June, 2013.

The Turnpike Commission has also committed up to $500,000 in electric upgrades at the plazas to provide the charging stations with the necessary voltage

For more information on companies in this article

Related Content

  • US$5 billion turnpike widening work spans Route 66
    April 25, 2024
    A bridge replacement over historic Route 66 forms part of Oklahoma’s US$5 billion turnpike widening.
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • US Department of Transportation issues FASTLANE grants
    July 14, 2016
    Grants worth a total of US$800 million have been issued by the US Department of Transportation (USDOT).
  • Taiwan developing its own EV technology
    April 26, 2012
    Taiwan’s electric vehicle (EV) industry is moving from parts manufacturing to marketing own brands, with the island’s solid base in information and communication technology (ICT) helping it to make its name on the EV stage. Taiwan is also working vigorously to develop its own EV technology, placing it among countries like Brazil.