Skip to main content

Penang’s PAN 1 project to go ahead amid environmental concerns

Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study. Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily. The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km. Penang Island, around 300km², is the main islan
April 17, 2019 Read time: 2 mins
Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study.


Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily.

The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km.

Penang Island, around 300km², is the main island of the state of Penang, located at the Malacca Strait, off the northwestern coast of Peninsular Malaysia. The island is home to nearly half of Penang state's population, including the city of George Town with a population of more than 710,000. The historical centre of George Town has been a 1384 UNESCO World Heritage Site since 2008.

The project will consist of a six-lane highway to alleviate congestion on local roads across the island, including the Tun Dr Lim Chong Eu Expressway and surrounding arterial roads.
 
The Department of Environment approved PAN 1 but with 56 conditions attached, according to Chow Kon Yeow, chief minister of Penang state and who made the announcement.

However, some environmental groups expressed concern over the highway’s impact on the countryside, including any dangers to heritage sites.

For more information on companies in this article

Related Content

  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • Colombia’s popular highway tenders
    April 7, 2014
    International interest is strong in tenders opening in Colombia for the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad, worth some US$4.75 billion in all. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built