Skip to main content

Penang’s PAN 1 project to go ahead amid environmental concerns

Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study. Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily. The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km. Penang Island, around 300km², is the main islan
April 17, 2019 Read time: 2 mins
Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study.


Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily.

The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km.

Penang Island, around 300km², is the main island of the state of Penang, located at the Malacca Strait, off the northwestern coast of Peninsular Malaysia. The island is home to nearly half of Penang state's population, including the city of George Town with a population of more than 710,000. The historical centre of George Town has been a 1384 UNESCO World Heritage Site since 2008.

The project will consist of a six-lane highway to alleviate congestion on local roads across the island, including the Tun Dr Lim Chong Eu Expressway and surrounding arterial roads.
 
The Department of Environment approved PAN 1 but with 56 conditions attached, according to Chow Kon Yeow, chief minister of Penang state and who made the announcement.

However, some environmental groups expressed concern over the highway’s impact on the countryside, including any dangers to heritage sites.

For more information on companies in this article

Related Content

  • India mulls feasibility of bridge over Palk Straight to Sri Lanka
    October 27, 2015
    India will carry out a feasibility study on a road link between Rameswaram in Tamil Nadu state and Thalaimannar in Sri Lanka, a federal government minister has said. "It needs the consent of both countries,” said Union minister of state for road transport, highways and shipping, Pon Radhakrishnan. “The project needs to be discussed at various levels," according to a brief report by India’s Hindu newspaper. Radhakrishnan told the reporters that federal government had begun consultations to carry out a
  • Indonesia’s Trans-Sumatra highway inches ahead
    March 11, 2015
    Indonesia will form a consortium of state enterprises to build all the 2,700km of the Trans-Sumatra toll highway, from Lampung to Aceh on the island of Sumatra. The finance department is also setting up special infrastructure banks to provide flexible loans for the state departments to fund the project, Indonesian media reported. Indonesia recently changed the law that had the state infrastructure company PT Hutama Karya as the only organisation allowed to build major projects. Other state enterprises can n
  • Lintec & Linnhoff on the Pan-Borneo
    November 26, 2021
    A number of Lintec & Linnhoff asphalt plants are on site, including the CSD 3000, CSD 2500B and TSD 1500 units.
  • Bangkok in line for N1 Expressway tunnel
    September 15, 2023
    EXAT, the Expressway Authority of Thailand, said bidding could start in 2026 with construction starting in 2027 and opening in 2030.