Skip to main content

Penang’s PAN 1 project to go ahead amid environmental concerns

Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study. Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily. The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km. Penang Island, around 300km², is the main islan
April 17, 2019 Read time: 2 mins
Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study.


Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily.

The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km.

Penang Island, around 300km², is the main island of the state of Penang, located at the Malacca Strait, off the northwestern coast of Peninsular Malaysia. The island is home to nearly half of Penang state's population, including the city of George Town with a population of more than 710,000. The historical centre of George Town has been a 1384 UNESCO World Heritage Site since 2008.

The project will consist of a six-lane highway to alleviate congestion on local roads across the island, including the Tun Dr Lim Chong Eu Expressway and surrounding arterial roads.
 
The Department of Environment approved PAN 1 but with 56 conditions attached, according to Chow Kon Yeow, chief minister of Penang state and who made the announcement.

However, some environmental groups expressed concern over the highway’s impact on the countryside, including any dangers to heritage sites.

For more information on companies in this article

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Major highway growth in Portugal
    February 14, 2012
    Twenty years ago Portugal was bottom of the European league in terms of roads and safety. A series of ambitious plans has seen the country rise to the top. Patrick Smith reports on how this was achieved
  • Major highway growth in Portugal
    April 12, 2012
    Twenty years ago Portugal was bottom of the European league in terms of roads and safety. A series of ambitious plans has seen the country rise to the top. Patrick Smith reports on how this was achieved In Portugal, out of 3,600km of main national roads (IP+IC), some 1,500km of motorways/high-capacity routes are financed under public-private partnership (PPP) agreements. These are tolled either using shadow tolls (these are being phased out) or real tolls, and plans are in hand to make routes multi free-fl
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t